Severity: 8192
Message: Optional parameter $all_pages declared before required parameter $files is implicitly treated as a required parameter
Filename: helpers/assets_loader_helper.php
Line Number: 2
Project completed in 2015, Construction of the entrance and exit stations for the cable railway and AB base for pillars; 1.718 m2 + route 3.174 m2